Mark the evidence groups already available. The score estimates quotation readiness only; unchecked technical fields remain open for engineering review.
Reference Part number, drawing, sample or measured photographs
Both interfaces DKO or port end plus gauge, hose, sensor or test point end
Orientation and access Straight/90-degree choice, clocking, wrench and hose envelope
Pressure duty Normal requirement, transient basis and intended connection state
Fluid and temperature Fluid identity and full operating range
Quantity Trial, batch and annual demand where available
Acceptance documents Drawing, inspection, traceability or test evidence requested
Commercial inputs Sample need, logo, target timing and payment contact
Shipment route Trade term, destination and preferred loading port
Mark the available groups, then calculate.