Get in touch with TIME Company
Gauge Mounting Route Comparator
Score three mounting routes against known job constraints. The top score is a review direction, not a model or safety approval.
Scoring boundaries
- Panel availability increases the bulkhead-route score.
- Direct access increases the at-point gauge score.
- Remote separation gains weight under demanding exposure.
- Access limits change serviceability before they change hardware.
- Vibration moves attention toward isolation and routing.
- Heat calls for a separate operating-envelope review.
- Distance values check geometric hose reserve only.
- Declared constants are transparent decision weights.
- Ties return review required instead of a forced winner.
- Results never establish pressure suitability.
- Evidence for both interfaces remains mandatory.
- Selection still belongs to the current drawing.
- Operators should define the viewing and service position.
- Drawings should show obstructions and locking access.
- Unknowns reduce confidence rather than becoming zero-risk inputs.
Route Evaluation
Job constraints
Comparison
Bulkhead route: —
Panel pass-through reviewDirect route: —
Gauge at measurement pointRemote route: —
Hose-mounted gauge reviewComplete the known constraints, then compare the routes.

